LINEAR REGRESSION ANALYSIS
Probability Distribution                
Time-to-Failure Data for Special Equipment Confidence Level Time-to-Failure Data from Dimitri Kececioglu, Reliability Engineering Handbook, Vol. 1 (Englewood Cliffs, NJ: Prentice Hall, Inc.), pp. 477-480.
Probability Plotting of Linearized Models: Weibull: Ln(Ln(1/(1-Q))) vs. Ln(T+t)
LINEAR REGRESSION ANALYSIS Probability Distribution
 
             
Time-to-Failure Data for Special Equipment Confidence Level Time-to-Failure Data from Dimitri Kececioglu, Reliability Engineering Handbook, Vol. 1 (Englewood Cliffs, NJ: Prentice Hall, Inc.), pp. 477-480.
Probability Plotting of Linearized Models: Weibull: Ln(Ln(1/(1-Q))) vs. Ln(T+t)
LINEAR REGRESSION ANALYSIS Probability Distribution
         
Time-to-Failure Data for Special Equipment
Confidence Level Time-to-Failure Data from Dimitri Kececioglu, Reliability Engineering Handbook, Vol. 1 (Englewood Cliffs, NJ: Prentice Hall, Inc.), pp. 477-480.
Probability Plotting of Linearized Models: Weibull: Ln(Ln(1/(1-Q))) vs. Ln(T+t)